This project was located in Destrehan, Louisiana.
This 90-foot tall, cement smoke stack was located on what was an old plantation which was purchased by a refinery. Due to the severity of the cracks in the smoke stack, our project was to remove the entire structure. This job required:
- 50-ton hydraulic crane
- winch system (in-house, custom designed for this particular project )
- backhoe to bury the anchor systems.